Galloper Wind Farm – Procurement

The project involved the supply of materials and services that supported the day-to-day operations and maintenance of the project. The following services were successfully provided:

Fitting out GIS Offices: The project included the installation and setup of Geographic Information System (GIS) offices. This involved equipping the offices with the necessary infrastructure, furniture, and technology to facilitate the efficient management and analysis of geographical data.

Noise Monitors: Noise monitoring equipment and services were supplied to monitor and assess the noise levels within the project area. This helped ensure compliance with noise regulations and allowed for proactive measures to mitigate any potential noise disturbances.

Drain Maintenance: Regular drain maintenance services were carried out to ensure the proper functioning of drainage systems. This involved inspection, cleaning, and necessary repairs to prevent waterlogging and maintain effective drainage within the project site.

Road Condition Survey: A comprehensive survey of road conditions was conducted to assess the state of the roads within the project area. This survey involved collecting data on road quality, surface conditions, and any necessary repairs or maintenance needed to ensure safe and reliable transportation.

Temporary Safety Showers: The project provided temporary safety showers to ensure the safety and well-being of workers within the project site. These showers were set up to provide immediate access to emergency decontamination in case of accidents or exposure to hazardous substances.

The supply of materials and services contributed to the smooth day-to-day running of the project. By fitting out GIS offices, the project enabled efficient data management and analysis. Noise monitors helped maintain a conducive environment, while drain maintenance ensured proper water management. The road condition survey allowed for timely repairs and maintenance, enhancing road safety. Lastly, the provision of temporary safety showers prioritized the well-being of workers and emergency preparedness.

Through these services, the project aimed to support the project’s functionality, safety, and operational efficiency.