Galloper Wind Farm

Innergy

  • Relining the berm for change of cable route 
  • As part of this we moved 6000 tons
  • This was also hydroseeded 

Demobilise the SEASA compound:

  • The hoarding was removed 
  • The type 1 compound and access road was removed
  • 1500 m3 
  • The ground was regraded
  • The area was hydroseeded 

Tree and shrub planting:

  • Over 7000 trees and shrubs 
  • Guarantee and maintain for 3 years 
  • We also maintain the grass and weeds.
  • The site has issues with ragwort 

Fencing:

  • Transition joint bay
  • Reptile exclusion fencing 
  • Shockproof boundary fencing 
  • Tree protection fencing removal
innergy